In a major feat, the Madras Engineers Group of the Indian Army built a 190-foot-long bridge amid the Wayanad landslide tragedy in just 16 hours to speed up the relief work. The bridge, which has a capacity of 24 tons, has been built under the supervision and efforts of Major Seeta in Wayanad.