Kolkata Metro Railway (KMR) introduced India’s first battery backup system as it commissioned a Battery Energy Storage System (BESS) on the underground stretch of the Blue Line.
To enhance operational resilience, KMR has deployed a 4 MW/6.4 MWh battery energy storage. As per reports, the stored power can move stranded trains at speeds of up to 55 kmph from mid-tunnel to the next station in case of a power failure.
This story has been sourced from a third party syndicated feed, agencies. Mid-day accepts no responsibility or liability for its dependability, trustworthiness, reliability and data of the text. Mid-day management/mid-day.com reserves the sole right to alter, delete or remove (without notice) the content in its absolute discretion for any reason whatsoever